|
News
Expansion of Spa and Hotel Levitunturi
Spa Water World - ready 2nd September 2010
The project includes a large expansion of the sauna and pool section of the spa, a new bowling alley on the lower floor, a children's playhouse and a new spa hotel building.
The new spa water world will offer a total of 17 indoor and outdoor pools, some of which are on two levels. The water surface will be more than tripled. There will be nine saunas of different types. The spa building will receive a new lower floor with an eight-lane bowling alley and a children's world. Each floor will include restaurant and bar areas.
It's snowing in the Spa Water World
The new water world will be unique and full of surprising contrasts: pools with water temperature ranging from hot to cold, a winter landscape with snowfall, a blue twilight moment, a refreshing mountain stream next to a hot pool and other amazing effects.
New Spa Hotel with junior suites and superior twins
The new three-floor Spa Hotel will be constructed near the main slope and include 30 junior suites, each with a balcony and a sauna, as well as 18 superior twins with balcony. The plan includes an indoor access to the spa from the hotel building. The hotel expansion will be ready on 19th August and Spa Hotel Levitunturi will be able to offer then a total of 220 rooms with 756 beds.
Impact of the construction
Our existing spa is now closed, it will be integrated into the new one.
The building site is be a blemish on our hotel grounds. However, the construction will not disturb your sleep, dancing and meals.
The new spa wil be opened on 2nd September 2010.
|